We were contracted to refit 69 existing hotel bedroom & bathroom suites.
Each bathroom refit consisted of the removal of original items plus installation of the following:
- Sanitary-ware
- Plumbing
- Tiles
- Corian Tops
- Flooring
- Accessories
Bedroom refit consisted of removal of existing fixing & fittings, plus the following work was carried out:
- Decorating
- Design, Manufacture of case goods
- Installation of case goods
- rewiring the bedrooms
- source new carpet